Another superb project installed by our client on a jetty.


Key Takeaways:


** Once the V-Deck system was installed, no safety boat cover was required as the works was classified as in board. This leads to significant cost savings to the client plus frees up the safety boat for other work scopes.


** The unique design of the V-Deck means that there were no Contact Points on the steelwork being coated at all. This leads to a far higher quality of coating application as contact points are the first point for corrosion.


** 72% Time Savings were delivered on this project compared to suspended scaffolding. Installing a small moving work front, our client was able to deliver this top quality project with huge time savings.