Jo BissetOct 9, 20191 minV-Deck™ Delivers 83% Time Saving Compared to ScaffoldAccess was required to the topmost strake of the methane tank (33m high) to undertake maintenance around the full perimeter (33.5m) of...
Jo BissetJul 1, 20191 minA Highly Productive Work Platform (Over & Above 88% Installation Time Savings)88% Time Savings on the installation of a suspended work platform compared to scaffolding is a significant time and cost saving. But that...
Jo BissetJun 18, 20191 min72% Time Savings & Zero Contact Points Another superb project installed by our client on a jetty. Key Takeaways: ** Once the V-Deck system was installed, no safety boat cover...
Jo BissetMay 7, 20191 minPipe Bridge Access SolvedHow do you provide a fast to install suspended work platform on an offshore pipe bridge? The standard scaffolding solution was very...